TOOLS
REQUIRED
|
-
Fine tooth saw
-
Tape Measure
-
Pencil
-
Hammer or Stapler
|
- Straight Edge
- Silicone Sealant
- Panel Pins &
Stapler or Adhesive
|
|
Step One
Check that walls are even. Otherwise, fix
battens to wall. For showers, backing should
be wet area plasterboard or fibro cement
sheeting. The EDGING can be used to cap the
top (and sometimes bottom) of the panels. For
full ceiling height, EDGING can be fixed to
the top of the wall before installing panels.
|

|
Step Two
Cut EDGING to size with fine
tooth saw. Fit in vertical position at wall
edge (if starting in corner, fit CORNER
PROFILE) and staple, pin or glue to wall.
|

|
Step Three
Cut Panelscape panels to
length using fine tooth saw. Fit first panel
ROUNDED EDGE into EDGING or CORNER PROFILE.
Apply silicone adhesive to the back of the
panel and glue to wall or battens.
|

|
Step Four
Panels can be also fixed to
wall or battens by stapling or nailing through
the U shape panel edge instead of, or as well
as, applying adhesive to the back of the
panels.
|

|
Step Five
Repeat until the whole wall is
covered. To install the last panel, fit the
EDGING or CORNER PROFILE and measure the
distance left. Deduct 6mm for the measurement
and cut the panel to fit.
NOTE: For shower or
bath walls, panel joins and bottom of panels
should be thoroughly sealed with mould
resistant silicone sealant.
|

|